You can enjoy 365 days free update after purchase of our ISO-IEC-27005-Risk-Manager exam torrent. About the updated PECB study material, our system will send the latest one to your payment email automatically as soon as the ISO-IEC-27005-Risk-Manager updated. So you can study with the latest ISO-IEC-27005-Risk-Manager Study Material. In addition, Free4Dump offer you the best valid ISO-IEC-27005-Risk-Manager training pdf, which can ensure you 100% pass. Try our ISO-IEC-27005-Risk-Manager free demo before you buy, you will be surprised by our high quality ISO-IEC-27005-Risk-Manager pdf vce.
If you want to maintain your job or get a better job for making a living for your family, it is urgent for you to try your best to get the ISO-IEC-27005-Risk-Manager certification. We are glad to help you get the certification with our best ISO-IEC-27005-Risk-Manager study materials successfully. Our company has done the research of the study material for several years, and the experts and professors from our company have created the famous ISO-IEC-27005-Risk-Manager learning prep for all customers.
>> Practice Test PECB ISO-IEC-27005-Risk-Manager Pdf <<
To pass the ISO-IEC-27005-Risk-Manager exam, you must put in a lot of time studying, practicing, and working hard. You will need real PECB ISO-IEC-27005-Risk-Manager Questions and the necessary understanding of the exam's format to pass the ISO-IEC-27005-Risk-Manager test. Without preparing with actual PECB Certified ISO/IEC 27005 Risk Manager (ISO-IEC-27005-Risk-Manager) questions, applicants find it difficult to get the knowledge essential to pass the PECB certification exam in a short time.
NEW QUESTION # 17
Scenario 6: Productscape is a market research company headquartered in Brussels, Belgium. It helps organizations understand the needs and expectations of their customers and identify new business opportunities. Productscape's teams have extensive experience in marketing and business strategy and work with some of the best-known organizations in Europe. The industry in which Productscape operates requires effective risk management. Considering that Productscape has access to clients' confidential information, it is responsible for ensuring its security. As such, the company conducts regular risk assessments. The top management appointed Alex as the risk manager, who is responsible for monitoring the risk management process and treating information security risks.
The last risk assessment conducted was focused on information assets. The purpose of this risk assessment was to identify information security risks, understand their level, and take appropriate action to treat them in order to ensure the security of their systems. Alex established a team of three members to perform the risk assessment activities. Each team member was responsible for specific departments included in the risk assessment scope. The risk assessment provided valuable information to identify, understand, and mitigate the risks that Productscape faces.
Initially, the team identified potential risks based on the risk identification results. Prior to analyzing the identified risks, the risk acceptance criteria were established. The criteria for accepting the risks were determined based on Productscape's objectives, operations, and technology. The team created various risk scenarios and determined the likelihood of occurrence as "low," "medium," or "high." They decided that if the likelihood of occurrence for a risk scenario is determined as "low," no further action would be taken. On the other hand, if the likelihood of occurrence for a risk scenario is determined as "high" or "medium," additional controls will be implemented. Some information security risk scenarios defined by Productscape's team were as follows:
1. A cyber attacker exploits a security misconfiguration vulnerability of Productscape's website to launch an attack, which, in turn, could make the website unavailable to users.
2. A cyber attacker gains access to confidential information of clients and may threaten to make the information publicly available unless a ransom is paid.
3. An internal employee clicks on a link embedded in an email that redirects them to an unsecured website, installing a malware on the device.
The likelihood of occurrence for the first risk scenario was determined as "medium." One of the main reasons that such a risk could occur was the usage of default accounts and password. Attackers could exploit this vulnerability and launch a brute-force attack. Therefore, Productscape decided to start using an automated "build and deploy" process which would test the software on deploy and minimize the likelihood of such an incident from happening. However, the team made it clear that the implementation of this process would not eliminate the risk completely and that there was still a low possibility for this risk to occur. Productscape documented the remaining risk and decided to monitor it for changes.
The likelihood of occurrence for the second risk scenario was determined as "medium." Productscape decided to contract an IT company that would provide technical assistance and monitor the company's systems and networks in order to prevent such incidents from happening.
The likelihood of occurrence for the third risk scenario was determined as "high." Thus, Productscape decided to include phishing as a topic on their information security training sessions. In addition, Alex reviewed the controls of Annex A of ISO/IEC 27001 in order to determine the necessary controls for treating this risk. Alex decided to implement control A.8.23 Web filtering which would help the company to reduce the risk of accessing unsecure websites. Although security controls were implemented to treat the risk, the level of the residual risk still did not meet the risk acceptance criteria defined in the beginning of the risk assessment process. Since the cost of implementing additional controls was too high for the company, Productscape decided to accept the residual risk. Therefore, risk owners were assigned the responsibility of managing the residual risk.
Based on scenario 6, Alex reviewed the controls of Annex A of ISO/IEC 27001 to determine the necessary controls for treating the risk described in the third risk scenario. According to the guidelines of ISO/IEC 27005, is this acceptable?
Answer: A
Explanation:
According to ISO/IEC 27005, organizations can use any set of controls to treat identified risks as long as they are appropriate and necessary for managing those risks. Annex A of ISO/IEC 27001 provides a comprehensive set of controls that can be used to mitigate various information security risks. In this scenario, Alex reviewed the controls from Annex A of ISO/IEC 27001 and selected control A.8.23 (Web filtering) to treat the risk associated with phishing and accessing unsecured websites. This approach aligns with ISO/IEC 27005, which allows selecting relevant controls from any set to effectively manage risks. Therefore, option C is the correct answer.
Reference:
ISO/IEC 27005:2018, Clause 8.6, "Risk Treatment," which allows for selecting controls from a set, such as Annex A of ISO/IEC 27001, to treat risks appropriately.
ย
NEW QUESTION # 18
Scenario 2: Travivve is a travel agency that operates in more than 100 countries. Headquartered in San Francisco, the US, the agency is known for its personalized vacation packages and travel services. Travivve aims to deliver reliable services that meet its clients' needs. Considering the impact of information security in its reputation, Travivve decided to implement an information security management system (ISMS) based on ISO/IEC 27001. In addition, they decided to establish and implement an information security risk management program. Based on the priority of specific departments in Travivve, the top management decided to initially apply the risk management process only in the Sales Management Department. The process would be applicable for other departments only when introducing new technology.
Travivve's top management wanted to make sure that the risk management program is established based on the industry best practices. Therefore, they created a team of three members that would be responsible for establishing and implementing it. One of the team members was Travivve's risk manager who was responsible for supervising the team and planning all risk management activities. In addition, the risk manager was responsible for monitoring the program and reporting the monitoring results to the top management.
Initially, the team decided to analyze the internal and external context of Travivve. As part of the process of understanding the organization and its context, the team identified key processes and activities. Then, the team identified the interested parties and their basic requirements and determined the status of compliance with these requirements. In addition, the team identified all the reference documents that applied to the defined scope of the risk management process, which mainly included the Annex A of ISO/IEC 27001 and the internal security rules established by Travivve. Lastly, the team analyzed both reference documents and justified a few noncompliances with those requirements.
The risk manager selected the information security risk management method which was aligned with other approaches used by the company to manage other risks. The team also communicated the risk management process to all interested parties through previously established communication mechanisms. In addition, they made sure to inform all interested parties about their roles and responsibilities regarding risk management. Travivve also decided to involve interested parties in its risk management activities since, according to the top management, this process required their active participation.
Lastly, Travivve's risk management team decided to conduct the initial information security risk assessment process. As such, the team established the criteria for performing the information security risk assessment which included the consequence criteria and likelihood criteria.
Did Travivve's risk management team identify the basic requirements of interested parties in accordance with the guidelines of ISO/IEC 27005? Refer to scenario 2.
Answer: C
Explanation:
According to ISO/IEC 27005, understanding the organization and its context, including the identification of interested parties and their requirements, is a critical part of the risk management process. The team at Travivve identified the interested parties and their basic requirements and determined the status of compliance with these requirements, which aligns with the guidelines provided by ISO/IEC 27005. This standard recommends that organizations should understand their context and stakeholders' requirements to effectively manage risks. Additionally, it is appropriate to evaluate compliance with requirements as part of the context analysis, rather than after implementing risk treatment options. Therefore, the team's approach was in accordance with ISO/IEC 27005, making option C the correct answer.
Reference:
ISO/IEC 27005:2018, Clause 7, "Context Establishment," which outlines the importance of identifying the context, including the interested parties and their requirements, as a basis for risk management.
ย
NEW QUESTION # 19
Scenario 6: Productscape is a market research company headquartered in Brussels, Belgium. It helps organizations understand the needs and expectations of their customers and identify new business opportunities. Productscape's teams have extensive experience in marketing and business strategy and work with some of the best-known organizations in Europe. The industry in which Productscape operates requires effective risk management. Considering that Productscape has access to clients' confidential information, it is responsible for ensuring its security. As such, the company conducts regular risk assessments. The top management appointed Alex as the risk manager, who is responsible for monitoring the risk management process and treating information security risks.
The last risk assessment conducted was focused on information assets. The purpose of this risk assessment was to identify information security risks, understand their level, and take appropriate action to treat them in order to ensure the security of their systems. Alex established a team of three members to perform the risk assessment activities. Each team member was responsible for specific departments included in the risk assessment scope. The risk assessment provided valuable information to identify, understand, and mitigate the risks that Productscape faces.
Initially, the team identified potential risks based on the risk identification results. Prior to analyzing the identified risks, the risk acceptance criteria were established. The criteria for accepting the risks were determined based on Productscape's objectives, operations, and technology. The team created various risk scenarios and determined the likelihood of occurrence as "low," "medium," or "high." They decided that if the likelihood of occurrence for a risk scenario is determined as "low," no further action would be taken. On the other hand, if the likelihood of occurrence for a risk scenario is determined as "high" or "medium," additional controls will be implemented. Some information security risk scenarios defined by Productscape's team were as follows:
1. A cyber attacker exploits a security misconfiguration vulnerability of Productscape's website to launch an attack, which, in turn, could make the website unavailable to users.
2. A cyber attacker gains access to confidential information of clients and may threaten to make the information publicly available unless a ransom is paid.
3. An internal employee clicks on a link embedded in an email that redirects them to an unsecured website, installing a malware on the device.
The likelihood of occurrence for the first risk scenario was determined as "medium." One of the main reasons that such a risk could occur was the usage of default accounts and password. Attackers could exploit this vulnerability and launch a brute-force attack. Therefore, Productscape decided to start using an automated "build and deploy" process which would test the software on deploy and minimize the likelihood of such an incident from happening. However, the team made it clear that the implementation of this process would not eliminate the risk completely and that there was still a low possibility for this risk to occur. Productscape documented the remaining risk and decided to monitor it for changes.
The likelihood of occurrence for the second risk scenario was determined as "medium." Productscape decided to contract an IT company that would provide technical assistance and monitor the company's systems and networks in order to prevent such incidents from happening.
The likelihood of occurrence for the third risk scenario was determined as "high." Thus, Productscape decided to include phishing as a topic on their information security training sessions. In addition, Alex reviewed the controls of Annex A of ISO/IEC 27001 in order to determine the necessary controls for treating this risk. Alex decided to implement control A.8.23 Web filtering which would help the company to reduce the risk of accessing unsecure websites. Although security controls were implemented to treat the risk, the level of the residual risk still did not meet the risk acceptance criteria defined in the beginning of the risk assessment process. Since the cost of implementing additional controls was too high for the company, Productscape decided to accept the residual risk. Therefore, risk owners were assigned the responsibility of managing the residual risk.
Based on the scenario above, answer the following question:
Which risk treatment option was used for the first risk scenario?
Answer: C
Explanation:
Risk modification involves implementing measures to reduce the likelihood or impact of a risk. In the first risk scenario, Productscape decided to use an automated "build and deploy" process to reduce the likelihood of an attacker exploiting a security misconfiguration vulnerability. This action aims to lower the risk to an acceptable level, which is characteristic of risk modification. Option B (Risk avoidance) would involve eliminating the risk by avoiding the activity altogether, which is not what was done. Option C (Risk sharing) involves transferring some or all of the risk to a third party, which is not applicable in this scenario.
ย
NEW QUESTION # 20
Scenario 3: Printary is an American company that offers digital printing services. Creating cost-effective and creative products, the company has been part of the printing industry for more than 30 years. Three years ago, the company started to operate online, providing greater flexibility for its clients. Through the website, clients could find information about all services offered by Printary and order personalized products. However, operating online increased the risk of cyber threats, consequently, impacting the business functions of the company. Thus, along with the decision of creating an online business, the company focused on managing information security risks. Their risk management program was established based on ISO/IEC 27005 guidelines and industry best practices.
Last year, the company considered the integration of an online payment system on its website in order to provide more flexibility and transparency to customers. Printary analyzed various available solutions and selected Pay0, a payment processing solution that allows any company to easily collect payments on their website. Before making the decision, Printary conducted a risk assessment to identify and analyze information security risks associated with the software. The risk assessment process involved three phases: identification, analysis, and evaluation. During risk identification, the company inspected assets, threats, and vulnerabilities. In addition, to identify the information security risks, Printary used a list of the identified events that could negatively affect the achievement of information security objectives. The risk identification phase highlighted two main threats associated with the online payment system: error in use and data corruption After conducting a gap analysis, the company concluded that the existing security controls were sufficient to mitigate the threat of data corruption. However, the user interface of the payment solution was complicated, which could increase the risk associated with user errors, and, as a result, impact data integrity and confidentiality.
Subsequently, the risk identification results were analyzed. The company conducted risk analysis in order to understand the nature of the identified risks. They decided to use a quantitative risk analysis methodology because it would provide more detailed information. The selected risk analysis methodology was consistent with the risk evaluation criteri a. Firstly, they used a list of potential incident scenarios to assess their potential impact. In addition, the likelihood of incident scenarios was defined and assessed. Finally, the level of risk was defined as low.
In the end, the level of risk was compared to the risk evaluation and acceptance criteria and was prioritized accordingly.
Based on scenario 3, what does the complicated user interface of the software which could lead to error present?
Answer: B
Explanation:
ISO/IEC 27005 defines a vulnerability as a weakness in an asset or control that could potentially be exploited by one or more threats. In the scenario, the complicated user interface of the payment software represents a weakness that could lead to user errors, potentially impacting data integrity and confidentiality. This aligns with the definition of a vulnerability, as it is a weakness that could be exploited by threats (e.g., errors in use). Therefore, the complicated user interface is correctly identified as a vulnerability, making option A the correct answer.
Reference:
ISO/IEC 27005:2018, Clause 8.3, "Risk Identification," where vulnerabilities are identified as weaknesses that can be exploited by threats.
ย
NEW QUESTION # 21
Scenario 7: Adstry is a business growth agency that specializes in digital marketing strategies. Adstry helps organizations redefine the relationships with their customers through innovative solutions. Adstry is headquartered in San Francisco and recently opened two new offices in New York. The structure of the company is organized into teams which are led by project managers. The project manager has the full power in any decision related to projects. The team members, on the other hand, report the project's progress to project managers.
Considering that data breaches and ad fraud are common threats in the current business environment, managing risks is essential for Adstry. When planning new projects, each project manager is responsible for ensuring that risks related to a particular project have been identified, assessed, and mitigated. This means that project managers have also the role of the risk manager in Adstry. Taking into account that Adstry heavily relies on technology to complete their projects, their risk assessment certainly involves identification of risks associated with the use of information technology. At the earliest stages of each project, the project manager communicates the risk assessment results to its team members.
Adstry uses a risk management software which helps the project team to detect new potential risks during each phase of the project. This way, team members are informed in a timely manner for the new potential risks and are able to respond to them accordingly. The project managers are responsible for ensuring that the information provided to the team members is communicated using an appropriate language so it can be understood by all of them.
In addition, the project manager may include external interested parties affected by the project in the risk communication. If the project manager decides to include interested parties, the risk communication is thoroughly prepared. The project manager firstly identifies the interested parties that should be informed and takes into account their concerns and possible conflicts that may arise due to risk communication. The risks are communicated to the identified interested parties while taking into consideration the confidentiality of Adstry's information and determining the level of detail that should be included in the risk communication. The project managers use the same risk management software for risk communication with external interested parties since it provides a consistent view of risks. For each project, the project manager arranges regular meetings with relevant interested parties of the project, they discuss the detected risks, their prioritization, and determine appropriate treatment solutions. The information taken from the risk management software and the results of these meetings are documented and are used for decision-making processes. In addition, the company uses a computerized documented information management system for the acquisition, classification, storage, and archiving of its documents.
Based on scenario 7, project managers communicate risks to external interested parties, taking into account the information confidentiality. Which principle of efficient communication strategy do project managers follow?
Answer: A
Explanation:
ISO/IEC 27005 emphasizes that effective risk management involves clear communication strategies, especially when it comes to ensuring that all stakeholders-both internal and external-are well-informed about potential risks and their impacts. The communication of risks is an essential part of the risk treatment process, as stated in the ISO/IEC 27005 standard.
In the given scenario, Adstry project managers are responsible for communicating risks to external interested parties, while carefully considering the confidentiality of the company's information. They ensure that the risks are conveyed with the appropriate level of detail, protecting sensitive information but still providing the necessary insights to interested parties. This level of disclosure ensures that stakeholders are well aware of the risks without compromising the organization's confidentiality policies.
The principle of transparency in communication refers to the clear, open, and honest sharing of information that stakeholders need in order to make informed decisions. By identifying interested parties, considering their concerns, and ensuring risk communication is well-prepared and detailed appropriately, Adstry's project managers are practicing transparency. They provide the necessary risk information while balancing the protection of confidential data.
Option A, credibility, refers to building trust in communication, which is not the primary focus in this context. Option B, responsiveness, is about timely reactions to risks or concerns but doesn't directly relate to how the information is communicated regarding risk confidentiality.
Thus, transparency is the correct answer because it aligns with how project managers ensure that the necessary risk details are communicated in a clear and honest way, while still protecting confidential information, as outlined by ISO/IEC 27005 risk communication principles.
ย
NEW QUESTION # 22
......
If your answer is yes then you need to start Channel Partner Program ISO-IEC-27005-Risk-Manager test preparation with PECB ISO-IEC-27005-Risk-Manager PDF Questions and practice tests. With the Free4Dump Channel Partner Program PECB Certified ISO/IEC 27005 Risk Manager ISO-IEC-27005-Risk-Manager Practice Test questions you can prepare yourself shortly for the final PECB Certified ISO/IEC 27005 Risk Manager ISO-IEC-27005-Risk-Manager exam.
Latest ISO-IEC-27005-Risk-Manager Practice Materials: https://www.free4dump.com/ISO-IEC-27005-Risk-Manager-braindumps-torrent.html
Our update can provide the latest and most useful Latest ISO-IEC-27005-Risk-Manager Practice Materials - PECB Certified ISO/IEC 27005 Risk Manager prep torrent to you and you can learn more and master more, In the course of studying ISO-IEC-27005-Risk-Manager preparation torrent, we will serve you throughout the process, and our back-office staff will provide 24-hour free online consultation, It is a feasible way but not an effective way for most office workers who have no enough time and energy to practice ISO-IEC-27005-Risk-Manager dump torrent.
Special Edition Using Microsoft Windows XP, Home Edition, This ISO-IEC-27005-Risk-Manager is largely because companies focus solely on content quality as the key to constructing a meaningful experience.
Our update can provide the latest and most useful ISO-IEC-27005-Risk-Manager 100% Exam Coverage PECB Certified ISO/IEC 27005 Risk Manager prep torrent to you and you can learn more and master more, In the course of studying ISO-IEC-27005-Risk-Manager Preparation torrent, we will serve you throughout the process, and our back-office staff will provide 24-hour free online consultation.
It is a feasible way but not an effective way for most office workers who have no enough time and energy to practice ISO-IEC-27005-Risk-Manager dump torrent, So our company has successfully developed the three versions of ISO-IEC-27005-Risk-Manager study guide materials for you to purchase.
PECB ISO-IEC-27005-Risk-Manager pdf dumps format contains actual ISO-IEC-27005-Risk-Manager exam questions.
TemanBisnisDigital adalah platform edukasi yang dirancang untuk membantu Anda memahami dan menguasai digital marketing agar bisnis Anda berkembang pesat.
ยฉ 2024 TemanBisnisDigital.id. Semua hak dilindungi. Dilarang memperbanyak tanpa izin.